Fabrite Engineering Ltd

Case studies

Design, Supply and Installation of Steelwork and Cladding at City Waste Recycling.

Steelwork and Cladding

Project description

Portal frame building with 12m wide doors to enable easily access/egress.

  • Feasibility studies
  • Value Engineering
  • Setting out site with Total Station
  • Construction supervision
  • 3D Drawing Package
  • Erection of Steel Frame
  • Installation of Cladding

 

Client

City Waste Ltd

 

Year

2009

 

Project budget

£ 300k

 

More images of this project

Title of key project 2

Project description
Value Engineering, Detailing, Fabricating and Installation of Steelwork and Metalwork for 3 New Health Centres.

  • Holywood Arches CCTC
  • Lisburn Road CCTC
  • Castlereagh CCTC

 

Client

Farrans Construction

 

Year

2007

 

Project budget

£ 2.4 million

 

Other projects at a glance

2008 Extension of Lagen Cement Mill - 1.2 Million

2007 Hyster - Crane/ Crane Rails -          340K

2006 Belfast International Airport -         320K

2005 Belfast International Airport -         520K